Okahandja Roads and Stormwater

Okahandja Roads and Stormwater

Lithon completed a detailed topographical survey and geotechnical investigation of current roads. Followed by detailed design, maintenance and construction of new roads and stormwater structures in Okahandja. Concrete drifts, stormwater culverts, and speed humps. Maintenance works included crack sealing, pothole repairs and crack sealing. Site Supervision of construction works is currently in progress.   DESCRIPTION…

Read More

Oranjemund Landfill Phase 2

Oranjemund Landfill Phase 2

The Oranjemund Town Council aims to play its part in reducing the Carbon footprint by meeting Environmental standards of Solid waste managements with this. Iit is therefore constructing a Landfill second of its kind in Namibia to the Kuppferberg landfill in Windhoek. The above Landfill consists of waste collection cells, Leachate dam and a Material…

Read More

Oranjemund Airport Crew Facility

Oranjemund Airport Crew Facility

Lithon was hired to offer their expertise in the design of the building’s Structural elements and Supervision thereof. The building has a massive reinforced concrete slab covering over 1000m2. The structural elements, bases, columns, surfacebeds, beams, and slabs all together carry over 20 tons of steel reinforcements.   DESCRIPTION OF SERVICES Structural Design and Supervision…

Read More

NAMPORT Conditions Survey

NAMPORT Conditions Survey

The Namibian Ports Authority (NAMPORT) has launched a 5-year project to record all their infrastructure on a system assisting with port maintenance and planning. Lithon Project Consultants was appointed to lead the project. A selected team of inspectors and assistants are traveling to all NAMPORT infrastructure to gather inventory and deterioration data to input into…

Read More

Auas Road

Auas road

Lithon was appointed to provide services for the rehabilitation and widening of Auas Road transforming it to a two-lane, dual carriageway.   DESCRIPTION OF PROJECT Widening of existing Auas Road to two-lane dual carriageway capacity A portion from Hosea Kutako Drive up to Blackwood Street would need three lanes per direction as per the latest…

Read More

NAMFISA Head Office

NAMFISA Head Office concepts

In mid-2024 the construction of a new multi-story building started. This was 10 year’s dream/vision from the NAMFISA team. The new 10-story structure will be an addition to the Windhoek skyline and the structure will take its place amongst the towering heights of Windhoek city center. As with any high rise, the construction of the…

Read More

Kapps Hotel Luderitz Project

Kapps Hotel Luderitz

The project involved the upgrade of the heritage Kapps Hotel from an old single storey building into a modern multiple storey building with additional rooms, offices, a swimming pool, a restaurant and a sky bar. The structural elements include mostly reinforced concrete consisting of over 100 columns, more than 100 beams, 9 slabs at different…

Read More

Green Industrialisation: Namibia’s Rise to Sustainable Power

Green Industrialisation: Namibia’s Rise to Sustainable Power

The fight against pollution and the need to future-proof the earth are driving a global movement towards green industrialisation. This includes more efficient and sustainable designs, less construction waste, green-production technologies and renewable energy sources.     With increased urbanisation, the benefits of green industrialisation are far-reaching. It reduces greenhouse gas emissions, promotes resource efficiency, and…

Read More

Meet Sam Ekandjo, CEO of Lithon Developers

Meet Sam Ekandjo, CEO of Lithon Developers

Lithon Developers has a new CEO. He’s passionate about the difference well-planned property development can make in the world, but did you know that this hard-working guy also has a 5th Dan black belt in karate, and likes to prepare budgets (just for fun) in his free time? We sat down with Sam to find…

Read More