Oranjemund Landfill Phase 2
The Oranjemund Town Council aims to play its part in reducing the Carbon footprint by meeting Environmental standards of Solid waste managements with this. Iit is therefore constructing a Landfill second of its kind in Namibia to the Kuppferberg landfill in Windhoek. The above Landfill consists of waste collection cells, Leachate dam and a Material Recycling Facility. The Cells consist of a lining system comprising an in-situ sand layer, a base preparation layer of silty clayey layer, a 1.5mm smooth HDPE geomembrane on the basal area and a double side textured HDPE geomembrane on the slope area, a protection geotextile on the basal and slope area, a stone leachate collection layer with a network of slotted HDPE collection pipes, and a geotextile separation/filter layer.
The proposed new Leachate Dam also has a lining system comprising an in-situ sand layer, a base preparation layer, a silty clayey layer, a 1.5mm smooth HDPE geomembrane on the basal area and a double side textured HDPE geomembrane on the slope area, a protection geotextile on the basal and slope area, and a stabilised sand layer.
The Lining prevents leachate seepage into the ground preventing pollution of the underground water and under-earth life. The leachate is thereby streamed into the leachate dam using pipe networks.
DESCRIPTION OF PROJECT
- The project entails the construction of a landfill site for the Oranjemund Town Council.
- The project is divided into three (3) phases.
- Phase 2 comprises the construction of cell 1, leachate dam, material recycling facility, water tower, conservancy tank, and weighbridge as well as an access road linking the landfill site to the town.
DESCRIPTION OF SERVICES
- Client liaison and coordination
- Project Management
- Contract administration
- Construction supervision
Assignment Name: Oranjemund Landfill Phase 2
Country: Namibia
Location: Oranjemund
Name of Client: Rent-A-Drum
Address: Landfill just outside of Oranjemund
Start date (mm/yyyy): August 2023
Completion date (mm/yyyy): January 2023
Name of associated Consultants (if any):
- Envitech (Landfill Specialist)
- RAD (Project Coordinator)
Approx. value of the contract (in current N$ equivalent): N$ 13.7 million
Duration of assignment in months: 18
Total No. of staff-months of the assignment: N/A
Approx. value of the services provided by your firm under the contract (in current N$ equivalent): N$ 1.3 million
No. of professional staff-months provided by associated Consultant: N/A
Names of the senior professional staff of the firm involved and functions performed (indicate most significant profiles such as Project Director / Coordinator, Team Leader):
Project Executive – Gert Maritz
Project Leader – Amarildo Paulo