The project entails the investigation, detailed design and supervision of runways at OR Tambo over a period of 5 years. Full-time site supervision and contract administration for quality control and assurance purposes during the course of the construction stage were also the responsibility of the consultant. Lithon was responsible for the detailed investigation and rehabilitation…
Read MoreThe project entails the detailed investigation of the airfield pavements and the rehabilitation of the runways, taxiways as well as extension of the aprons. A holding action phase on the main runway was also conducted prior to the full rehabilitation. Lithon conducts full-time site supervision and contract administration for quality control and assurance purposes during…
Read MoreUpgrading of about 8 km of gravel roads to bitumen standards within two existing extensions of Otjiwarongo. One extension is situated in the DRC informal settlement area consisting of hilly terrains. The other area is within a formalised area within Otjiwarongo. Services provided: Material investigations Geometric, pavement and storm water designs Contract administration Contract documentation…
Read MoreUpgrading a 75 km long section of the existing gravel road between Opuwo and Sesfontein to bitumen standards. Services provided: Client Liaison Material and Road Centreline Investigations Pavement Designs Hydrology Designs Contract Administration & Reporting Construction Supervision
Read MoreRoads and stormwater design for new township development. Project area is about 180ha for 2,500 houses. The study of external and internal bulk road infrastructure and the investigation, design and supervision for the provision of internal road infrastructure in road lengths in excess of 20km. Services provided: Client Liaison Geometric Designs Pavement Designs Storm water…
Read MoreThis was an investigation into the airside pavements only. A detailed investigation into the airside pavements was done. It include a concept long term layout plan and ICAO confirmation. Findings/recommendation include immediate close of a large section of the runway and warning relating to the new terminal being too close to the runway.
Read MoreThe railway line from Windhoek to Rehoboth is 97 kilometres long and is situated in the Khomas Region of Namibia. This section of track was completed in 1912 and upgraded to 18.5 ton axle load long welded track between 1970-1975. The project entails a study in the feasibility of upgrading the railway line, with all…
Read MoreDesign and construction of a new fuel station, which included the fuel forecourt and a convenience store/shop’s Civil, Structural, Mechanical and Electrical components. New building services required were sewer, storm water, potable water, fire protection, fire booster pump station and water storage tank, air-conditioning & ventilation, refrigeration, LPG, kitchen equipment, access control, cctv and electrical…
Read MoreBankable feasibility study, design and construction of a new 22 km long surfaced road and a 160 m long bridge over the Khan River. The first 4km section is over a relatively flat terrain before descending into moon landscapes, with rough terrains consisting of solid granite rock, which constituted massive blasting operations. 10 km of…
Read MoreDesign of a new dual carriage freeway between Windhoek and Rehoboth, totalling 92 km divided in 4 sections. 14 interchanges have been designed over the total length of the road. Sections 1A and 1B (33 km long) includes the freeway south of the interchange that connects T0901, T0106 and M0049. Section 2 (30 km) stretches…