Auas Road

Lithon was appointed to provide services for the rehabilitation and widening of Auas Road transforming it to a two-lane, dual carriageway.

 

DESCRIPTION OF PROJECT

  • Widening of existing Auas Road to two-lane dual carriageway capacity
  • A portion from Hosea Kutako Drive up to Blackwood Street would need three lanes per direction as per the latest conducted Traffic Impact Assessments
  • Rehabilitation of existing road surface
  • Providing curb stones and paved sidewalks
  • Upgrading of intersections
  • Extension of two major in-situ culverts

 

DESCRIPTION OF SERVICES

  • Client liaison
  • Material and road centreline investigations
  • Surveys e.g Traffic Impact Assessments, Topographical and locality of existing services
  • Existing Pavement Rehabilitation Design and New Pavement Design
  • Geometric Road Designs
  • Storm Water Designs
  • Structural design and detailing of major in-situ culverts
  • Reporting, Cost Estimates, Procurement, Contract administration

 

AUAS ROAD

Auas road

Auas road

Auas road

Auas road

 

AUAS ROAD MARCH 2025 RAINS

Auas road March 2025 rains

Auas road March 2025 rains

Auas road March 2025 rains

Auas road March 2025 rains

Auas road March 2025 rains

Auas road March 2025 rains

 

Assignment Name:  Rehabilitation and Widening of Auas Road (P3338)

Country:  Namibia 

Location: Windhoek

Name of Client: Roads Authority

Address: Auas Road in Windhoek

Start date (mm/yyyy): November 2023

Completion date (mm/yyyy): In progress

Name of associated Consultants (if any): N/A

Approx. value of the contract (in current N$ equivalent): N$ 138 million

Duration of assignment in months: Ongoing

Total No. of staff-months of the assignment: N/A

Approx. value of the services provided by your firm under the contract (in current N$ equivalent): N$ 12.6 million

No. of professional staff-months provided by associated Consultant: N/A

Names of the senior professional staff of the firm involved and functions performed (indicate most significant profiles such as Project Director / Coordinator, Team Leader):  

  • Project Manager: Gert Maritz
  • Project Engineer: Richard Laborn
  • Resident Engineer: Willie Knouwds
  • Civil Engineer: Hannes van Schalkwyk
  • Transport Engineer: Cilliers Steyn
  • Structural Engineer: Estee Beukes
  • Electrical Engineer: Mbandeuru Muhenje