Husab Mine Access Road

Lithon Holdings Project Management Husab Road Construction

Bankable feasibility study, design and construction of a new 22 km long surfaced road and a 160 m long bridge over the Khan River. The first 4km section is over a relatively flat terrain before descending into moon landscapes, with rough terrains consisting of solid granite rock, which constituted massive blasting operations. 10 km of…

Read More

Windhoek – Rehoboth Carriageway

Windhoek – Rehoboth Carriageway

Design of a new dual carriage freeway between Windhoek and Rehoboth, totalling 92 km divided in 4 sections. 14 interchanges have been designed over the total length of the road. Sections 1A and 1B (33 km long) includes the freeway south of the interchange that connects T0901, T0106 and M0049. Section 2 (30 km) stretches…

Read More