DORDABIS

CONTRACT VALUE: N$ 815 million
CLIENT: Lodestone Namibia (Pty) Ltd
COUNTRY: Namibia
LOCATION: Dordabis Area, Omaheke Region

TAGS:

Dordabis Iron Ore Project – Bankable Feasibility Study

Bankable Feasibility Study for the planned Dordabis Iron Ore Mine.

DESCRIPTION OF SERVICES

Bankable Feasibility Study as a member of the project team to investigate, carry out and report on the BFS-level design of the multi-disciplinary engineering, logistic and infrastructure components both on-site and off-site of the planned Dordabis Iron Ore Project.

The off-site infrastructure consisted of the provision of a 95km bulk water supply line, re-routing of 5km road section, upgrading of 3 road intersections, strengthening of 40km road section, widening of existing bridge structures, upgrading of an existing railway siding, upgrading of 25km railway line and provision of 35km overhead bulk electrical line. The on-site infrastructure consisted of the design of platforms for the processing plant, provision of all access roads, potable water supply and electrical reticulation.