Studies

Proper research and feasibility studies are fundamental to the success of any project. Our extensive services include needs analysis, pre-feasibility studies and bankable feasibility studies in various fields including infrastructure development, industrial, logistics, transportation and trade-off studies between various transport options especially in the mining sector, as well as commercial and residential development projects.

We are well versed with the criteria for performing the above studies where international funding is provided, such as the EU-Africa Infrastructure Trust Fund, KfW, the African Development Bank and GIZ.

We further offer flood line analysis studies, inundation studies, hydraulic modelling, situation assessment and optimisation of sources and bulk supply infrastructure, Spatial Integrated Development studies and Structure Plans.

Studies Projects

Sewer Master Plan for the Town of Otjiwarongo

The assessment of the bulk water scheme was conducted in 2016 and a full assessment of assets, operational requirements and maintenance was done.  Surveys and field work provided valuable base data which was used to forecast the demand on the water supply.  The study provided planning data to the employer in order to plan for…

Ondangwa Water Supply Masterplan

The Ondangwa Town Council expressed the urgent need to upgrade their bulk water supply system to support their infrastructure development initiatives and to sustain future growth of the town. The Town Council further experienced a number of operational and maintenance challenges on the current water supply system and Lithon Project Consultants compiled a Water Master…

Katwitwi Water Masterplan

Lithon Project Consultants was appointed by Namwater to do a situation assessment of a proposed Bulk Water Supply Scheme in Katwitwi in the north of Namibia. The services provided under this investigation are summarised below: Inception – confirmed the scope of work and any additions, alterations, omissions Field visits – each scheme component was visited…

Ondangwa Airside Investigation

This was an investigation into the airside pavements only. A detailed investigation into the airside pavements was done. It include a concept long term layout plan and ICAO confirmation. Findings/recommendation include immediate close of a large section of the runway and warning relating to the new terminal being too close to the runway.  

Noordoewer Aussenkehr

The Feasibility Study for DR212 entail the upgrading of the existing low volume surface road (Noordoewer-Aussenkehr) and upgrading of the gravel road section (Aussenkehr – Rosh Pinah) to bitumen standards. DR212 is a vital link to the economic activities along the Orange River as well as tourist activities within the southern area of Namibia. Services…

Commuter Railway Feasibility

The railway line from Windhoek to Rehoboth is 97 kilometres long and is situated in the Khomas Region of Namibia. This section of track was completed in 1912 and upgraded to 18.5 ton axle load long welded track between 1970-1975. The project entails a study in the feasibility of upgrading the railway line, with all…