Situated about 45km outside of Windhoek, Namibia’s Hosea Kutako International Airport (HKIA) handles all long-haul flights to and from the country. Originally opened in 1965, the airport is the main gateway into Namibia and creates the first impression visitors have of the country. In October 2019, work started on a large-scale upgrade of the airport,…

Read More
Lithon Holdings: Working together for a better world

Lithon Holdings is a group of companies specialising in innovative engineering and sustainable development, with our highly skilled team offering clients everything from consultation, conceptualisation, research and development planning to seamless project management and efficient execution from our offices in Namibia, South Africa and Ghana. But more than that, we are a company committed to…

Read More

The Riverport Development is a newly constructed mixed-use (residential and commercial units) for FaanberghWinckler Projects. This development comprises of 82 residential flats with a total floor area of 5845 square metres. The commercial units are located on ground floor, and totals to a floor space of 661 square metres. For this development, a total of…

Read More
Lithon Holdings Project Management Med Waste

Design, tender procurement, construction supervision and project management for the establishment of site works and infrastructure services for a Health Care Risk Treatment Facility. Planning, design, tendering, construction supervision and project management of all civil, structural, mechanical and electrical work for a modern medical waste treatment complex for the City of Windhoek. Acting as the…

Read More
Lithon Holdings Project Management Husab Road Construction

Bankable feasibility study, design and construction of a new 22 km long surfaced road and a 160 m long bridge over the Khan River. The first 4km section is over a relatively flat terrain before descending into moon landscapes, with rough terrains consisting of solid granite rock, which constituted massive blasting operations. 10 km of…

Read More
Lithon Holdings Project Management NamibBou

The total size of the project (Phase 1 – Phase 6) includes in excess of 900 erven to be serviced. The first three phases of the project consisted of servicing +/-450 erven with water and sewer reticulation infrastructure, as well as bitumen roads and storm water infrastructure. Lithon was appointed to conduct a feasibility study…

Read More
Lithon Holdings Kahenge Proper

Description of Project Development of 30 middle income houses with about 600m2 plots. Starting off with phase 1 consisting of 12 plots.  House types ranging from 1 Bedroom House to 3 Bedroom House. Services provided Project Management, Inception, Legal Review (ownership), Concept Planning, Environmental, Feasibility, Sales and Marketing, Legal / Statutory Requirements (including Town Planning),…

Read More

Multi-disciplinary Engineering, Detailed Design,Procurement, Construction Supervision and Project Management for a 372ha irrigation scheme in the North of Namibia.  Multi-disciplinary Engineering, Detailed Design, Procurement, Construction Supervision and Project Management for a 372ha irrigation scheme in the North of Namibia.  Soil Surveys were obtained to identify suitable crops for this area.  The scope entails all infrastructure…

Read More

Professional services for the design, preparation of tender documents, procurement evaluation and construction supervision and project management of Ndonga Linena Irrigation project Phase Two. Multi-disciplinary Engineering, Detailed Design and Construction Project Support for a 540ha irrigation scheme in the North of Namibia.  The scope entails all infrastructure requirements (river pump stations, booster pump stations, electrical reticulation,…

Read More