Situated about 45km outside of Windhoek, Namibia’s Hosea Kutako International Airport (HKIA) handles all long-haul flights to and from the country. Originally opened in 1965, the airport is the main gateway into Namibia and creates the first impression visitors have of the country. In October 2019, work started on a large-scale upgrade of the airport,…

Read More
Lithon Holdings Project Management Husab Road Construction

Bankable feasibility study, design and construction of a new 22 km long surfaced road and a 160 m long bridge over the Khan River. The first 4km section is over a relatively flat terrain before descending into moon landscapes, with rough terrains consisting of solid granite rock, which constituted massive blasting operations. 10 km of…

Read More
Lithon Holdings RHB Freeway

Design of a new dual carriage freeway between Windhoek and Rehoboth, totalling 92 km divided in 4 sections. 14 interchanges have been designed over the total length of the road. Sections 1A and 1B (33 km long) includes the freeway south of the interchange that connects T0901, T0106 and M0049. Section 2 (30 km) stretches…

Read More
Lithon Holdings Project Management NamibBou

The total size of the project (Phase 1 – Phase 6) includes in excess of 900 erven to be serviced. The first three phases of the project consisted of servicing +/-450 erven with water and sewer reticulation infrastructure, as well as bitumen roads and storm water infrastructure. Lithon was appointed to conduct a feasibility study…

Read More