Structural Engineering

Jan Jonker mixed-use development

Design and construction of a new five story mixed-use building, which included offices and residential units. Construction progressed to the final structural stage, which included bulk earth works, foundations and reinforced concrete works. Design of Civil, Mechanical and Electrical services were completed. These services included sewer, storm water, potable water, fire protection, detection & sprinkler…

Read More
Oshakati Open Market

Oshakati Open Market

The project entailed site preparation work through bulk filling and provision of access roads and storm water infrastructure. Building works entailed construction of a 40m high tower and several buildings. Lithon was appointed to do all Civil, Structural, Electric and Mechanical Engineering services for the Oshakati Open Market.  

Read More
Omugongo Lifestyle Estate

Omungono Lifestyle Estate

Financing, Town Planning and servicing and housing construction. Lithon was appointed to do contract administration and construction supervision from inception to completion. As well as to provide the following services: Civil Engineering Structural Engineering Electrical Engineering

Read More

Riverport Residential Estate Complex

The Riverport Development is a newly constructed mixed-use (residential and commercial units) for FaanberghWinckler Projects. This development comprises of 82 residential flats with a total floor area of 5845 square metres. The commercial units are located on ground floor, and totals to a floor space of 661 square metres. For this development, a total of…

Read More

Namcor Hosea Kutako International Airport Fuel Station

Design and construction of a new fuel station, which included the fuel forecourt and a convenience store/shop’s Civil, Structural, Mechanical and Electrical components. New building services required were sewer, storm water, potable water, fire protection, fire booster pump station and water storage tank, air-conditioning & ventilation, refrigeration, LPG, kitchen equipment, access control, cctv and electrical…

Read More
Lithon Holdings Project Management Med Waste

New Health Care Risk Waste Treatment Facility for Windhoek

Design, tender procurement, construction supervision and project management for the establishment of site works and infrastructure services for a Health Care Risk Treatment Facility. Planning, design, tendering, construction supervision and project management of all civil, structural, mechanical and electrical work for a modern medical waste treatment complex for the City of Windhoek. Acting as the…

Read More
Lithon Holdings Reservoir

Concrete Reservoir Walvis Bay

Civil Consultancy Services for the design and Project management of construction a 20ML concrete, potable water reservoir at Mile 7, Walvis Bay. Lithon was appointed as Consulting Engineers for the Design & Construction Supervision of the 20Ml Water Reservoir at Mile 7, Walvis Bay. The project scope consisted of: Construction of 20Ml Concrete Reservoir to…

Read More
Lithon Holdings Solar Power

Economic study on Concentrated Solar Power (*CSP) Plants

The analysis of macro-economic costs and benefits associated with the CSP plant suggestions on a 135 MW CR CSP plant with a 15-hour storage capacity and 135 MW PT CSP plant with a 9-hour storage capacity were considered.   Services provided Client liaison EIAResearch CSP models (Central Receiver and Parabolic trough) Performance analysis Macro-economic impact…

Read More
Lithon Holdings RHB Freeway

Windhoek – Rehoboth Carriageway

Design of a new dual carriage freeway between Windhoek and Rehoboth, totalling 92 km divided in 4 sections. 14 interchanges have been designed over the total length of the road. Sections 1A and 1B (33 km long) includes the freeway south of the interchange that connects T0901, T0106 and M0049. Section 2 (30 km) stretches…

Read More
Lithon Holdings Project Management NamibBou

NamibBou Housing Scheme (Oshakati)

The total size of the project (Phase 1 – Phase 6) includes in excess of 900 erven to be serviced. The first three phases of the project consisted of servicing +/-450 erven with water and sewer reticulation infrastructure, as well as bitumen roads and storm water infrastructure. Lithon was appointed to conduct a feasibility study…

Read More